# The form data below was edited by tom_tyler # Perforce Workshop Jobs # # Job: The job name. 'new' generates a sequenced job number. # Status: Job status; [open/closed/suspended]. Required # Project: The project this job is for. Required. # Severity: [A/B/C] (A is highest) Required. # ReportedBy The user who created the job. Can be changed. # ReportedDate: The date the job was created. Automatic. # ModifiedBy: The user who last modified this job. Automatic. # ModifiedDate: The date this job was last modified. Automatic. # OwnedBy: The owner, responsible for doing the job. Optional. # Description: Description of the job. Required. # DevNotes: Developer's comments. Optional. # Type: Type of job; [Bug/Feature]. Required. Job: SDP-7 Status: closed Project: perforce-software-sdp Severity: C ReportedBy: adrian_waters ReportedDate: 2017/04/01 17:54:36 ModifiedBy: tom_tyler ModifiedDate: 2017/04/03 09:26:14 Description: Normalize and enhance SDP email subject line and logs. I think the emailed logs (backups, verify, etc) are a bit 'messy', and don't provide an immediate indication that the jobs finished successfully. I'd like to tidy them up so they display more clearly In email (at moment in zimbra in the list if inbox emails the subject line merges with the start of the content so is not clear) , to be easier to read the content, and more importantly to have a positive success (or failure) indicator in both the subject line + body, making it easier to read & also to use email rules to process/filter accordingly. DevNotes: Originated on p4prod as job073942. This job, SDP-7, was originally named job000062, and for a time named job000275. Type: Feature